TOWN OF POMPEY
INSTRUCTIONS AND
PROCEDURES
FOR
SITE PLAN REVIEW & SPECIAL
PERMIT
WHEN IS IT REQUIRED?
Site Plan Review and Special Permit are two separate requirements that
often overlap so as to require simultaneous review by the Town of Pompey
Planing Board and Zoning Board of Appeals
respectively.
SITE PLAN REVIEW:
|
USE AND/OR STRUCTURE |
SITE PLAN REVIEW |
|
ONE AND TWO FAMILY STRUCTURE OR ACCESSORY STRUCTURE
|
NOT REQUIRED |
|
FARM STRUCTURES |
NOT REQUIRED |
|
EXPANSION OF EXISTING BUILDING OR STRUCTURE WHICH PREVIOUSLY
OBTAINED SITE PLAN APPROVAL AND IS IN FULL COMPLIANCE WITH EXISTING
REGULATION AND DOES NOT EXCEED 50% OF GROUND LEVEL SPACE EXISTING OF
EXISTING BUILDING OR 10,000 SQ. FT. WHICHEVER IS LESS |
NOT REQUIRED |
|
ALL OTHER NEW STRUCTURES, MODIFICATIONS, ALTERATIONS, OR
REPLACEMENTS OF EXISTING STRUCTURES AS WELL AS THE ESTABLISHMENT OF
ANY NEW USE OR ANY CHANGE IN AN EXISTING USE |
REQUIRED |
SPECIAL PERMIT:
The uses permitted by and requiring special permit are set forth in
THE SCHEDULE LIMITING THE USE OF BUILDINGS AND LAND ANNEXED TO THE
CHAPTER 165 OF THE CODE OF THE TOWN OF POMPEY. This schedule is based
on the Zoning District in which the property is located. A copy of this
schedule is attached for your use. All procedures and review criteria are
outlined in Chapter 165 of the Code of The Town of
Pompey.
SITE PLAN REVIEW PROCEDURE:
- Complete the attached application including supporting documentation
as outlined in the application.
- Submit the completed application to the Zoning Enforcement Officer
for review.
- When the Zoning Enforcement Officer determines the application
complete, notice shall made of a public hearing in a designated
newspaper at least five days prior to the date of the hearing.
- Notice of the hearing shall be sent to the applicant at least ten
days prior to the hearing date.
- A copy of the application shall be sent to the Onondaga County
Planning Board if required by General Municipal Law, Section 239-m.
- A copy of the application shall also be sent to Town Engineer,
State, County or Town Highway Department having jurisdiction of adjacent
or proposed highways and other persons or agencies as per his
discretion.
- At the hearing the Town Planning Board may require such additional
information from the applicant as it deems appropriate or necessary to
making a decision on the application. Decision giving approval, approval
with modifications, or disapproval of the project shall be made within
sixty-two days after the hearing.
- In the event that the Planning Board determines that an area
variance is required by the proposal, the matter will be referred to the
Zoning Board of Appeals and the 62 day decision time shall be stayed
during the referral.
- The time for a decision may be extended by mutual consent of the
Planning Board and the Applicant.
REVIEW CRITERIA FOR SITE PLAN REVIEW:
The Planning Board shall apply the following goals and objectives in
reviewing each application’s layout and design:
- Compatibility of the proposed use with neighboring uses.
- Safe and appropriate movement on and off site of vehicles and
pedestrians.
- Adequacy of fire safety and suppression systems.
- Suitability of landscaping, buffering, lighting and hours of
operation.
- Adequacy of proposed drainage and sewage systems and other
infrastructure.
- Suitability of proposed signage.
- Appropriateness of architectural design and treatment considering
neighboring structures.